Dnipro University of Technology — Compliance with the Time

Design of mines of new technological level with use of geoinformation technologies

DEVELOPERS: prof. V. I. Bondarenko, docent V.V. Ruskih, docent R.O. Dichkovsky.

ESSENCE OF THE PROJECT

Creation of systems of imitating reproduction of mining production processes for: ensuring mineral extraction with the defined content of metals and the minimum quantity of losses; increase of labor productivity at geological-surveying and design ensuring of mining operations; improvement of quality and validity of accepted decisions thanks to development of the system of automated design.

RANGE OF APPLICATION

Complex solution of a wide range of geological, surveying and technological problems of work of mining enterprises, scientific and design organizations. The system allows to work with three-dimensional models of objects of mining technology. Among them are: geological tests, ore bodies and layers, surveying points, mine openings, extraction units, constructive elements and the development system units.

INFORMATION FOR THE INVESTOR

  • The system can be used together with office software products
  • The cost of implementation of the project - 650 - 950 thousand UAH
  • Performance term - 3 - 7 months
  • Payback period - 1,5 - 2,5 

Services

Schedule

Social networks

Facebook
YouTube
© 2006-2024 Інформація про сайт